তারিখ
|
ই- টেন্ডার আই ডি
|
বিষয় ও ডাউনলোড
|
ক্রয়কারীর দপ্তর
|
12/12/2024 |
1006877 |
Construction of 13 nos Community Toilet, 54 nos Communal Bin & 05 nos Transfer Station at Cumilla City Corporation Area under Inclusive and Integrated Sanitation & Hygiene Project in 10 Priority Towns in Bangladesh of DPHE FY 2024-25 |
Office of the Executive Engineer's Cumilla, DPHE |
10/12/2024 |
1032450, 1032451 |
Installation of 5 nos Point source tube-wells ( 100mm* 50mm dia tube-well with 1.5 hp submersible pump)100 nos House hold water Connection and construction of 18 Street hydrant at Shariatpur Pourashava.
Construction of 5 nos Community Toilet 18 nos Communal Bin and 3 nos Transfer Station at Shariatpur Pourashava
|
Office Of the Shariatipur, DPHE |
03/12/2024 |
1044674, 1044681 |
Construction of 5 Nos Two Storied RCC WASH Block having 2 storied foundation for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Natore Sadar and Gurudaspur Upazila in Natore District
Construction of 5 Nos Single Storied RCC WASH Block having 2 storied foundation for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Singra Upazila in Natore District
|
Office Of the Executive Engineer's Office Natore |
28/11/2024 |
1042893, 1042897, 1042938, 1042943 |
Installation of 40 Nos (100 mm dia) deep tube well with submersible pump at different primary schools at Singra Upazila in Natore District.
Installation of 45 Nos (100 mm dia) deep tube well with submersible pump at different primary schools at Singra and Guruduspur Upazila in Natore District,
Installation of 25 Nos (100*38 mm dia) deep tube well with submersible pump at different primary schoolsat Baraigram Upazila in Natore District.
Installation of 23 Nos 100*38 mm dia deep tube well with submerible pump at different primary schools of Natore Sadar, Naldanga and Lalpur Upazila.
|
Office Of the Executive Enginner's Office Natore |
21/11/2024 |
1036262, 1036261, 1036260, 1036259, 1036258, 1036257, 1036044 |
Installation fo Deep Tube Well Installation of Rain Water Harvesting System |
Office Of the Executive Engineer Barguna District |
19/11/2024 |
1036209 |
Repair lighting arresters and Supply Square Parts for 2 Years Ukhiya Upazila Under Emergency Assistance Project for Water Supply and Sanitation at Ukhiya and Teknaf Upazila in Cox'x Bazar (FY 2024-25)
|
Office of the Project Directior, Emergency Assistance Project, Dhaka (EAP) |
17/11/2024 |
1036208 |
Construction of Distribution Pipe Network inter connection and household service connection water Supply including electric and other necessary works at ukhiya and SCADA for Ukhiya in Cox's Bazar District under Emergency Assistance Project for water supply and sanitation at Ukhiya and Teknaf Upazila in Cox's Bazar FY 2024-2025 |
Office of the Project Directior, Emergency Assistance Project, Dhaka (EAP) |
14/11/2024 |
1036210, 1035965 |
Construction of barbuire fencing perimeter road, blocks,geo.textiles, Plantation Slope protactive works entry gate etc of the Surface water reservoir (50 acre) at Palongkhali, Ukhiya Qpazila Sanitation at Ukhiya and Teknaf Upazila in Cox's Bazar (FY 2024-25)
Operation and maintenance of 07 nos water Carrier for Emergency Assistance Project of Water Supply and Sanitation of Ukhiya and Teknaf in Cox's Bazar FY (2024-25
|
Office of the Project Directior, Emergency Assistance Project, Dhaka (EAP) |
03/11/2024 |
1022983
|
Construction of 1 no. Faecal Sludge and 1 no. Solid Waste Management Plant/System in Patuakhali Sadar Paurashava of Bangladesh |
Office Of the Executive Engineer Patuakhali District, Patuakhali |
17/10/2024 |
1022990, 1022987, 1022989 |
1. Installation of Water Emergency flood Crossing) Distribution pipe Line of 400 m at Jamalpur Economic zone under BEZA (FY 2024-25)
2. Construction of 2.10 km RCC Surface Drain with cover slab and Walkway and Remaining works of 4.8 km existing surface drain at Jamalpur Economic zone, Jamalpur under BEZA (FY 2024-25)
3. Installation of Water Transmission Line. Distribution Pipe line and Water Transmission Line of Boar to Treatment Plant of 11.00 km and 110 Nos. Plot Connection at Jamalpur Economic zone under BEZA (FY 2024-25)
|
Office Of the Executive Engineer Jamalpur District, Jamalpur |
02/10/2024 |
1015100 |
Construction of 1 fecal Sludge and 1 Solid Waste Management Plant System at Pabna District |
Office Of the Executive Engineer, Pabna District |
15/09/2024 |
1009034 |
Construction of 01 No Faceal Sludge and 1 no Slid Waste Management Pland System at Sirajganj Paurashava. |
Office Of the Executive Engineer, Sirajganj District |
29/08/2024 |
106297 |
Land development work at Laskerpur in Pabna Pourashava of Pabna district under the Project |
Office of the Executive Engineer, Pabna District |
25/08/2024 |
1003758 |
Construction of 01 nos fecal sludge and 1 nos solid waste Management plant system at Jamalpur District Under the Project |
Office Of the Executive Engineer, Jamalpur District |
|
1008665,1008667,1008668,1008669,1008670,1008671,1008672 |
Installation of Deep Tube well with No. 6 Hand Pump and Installation Rain Water Harvesting at Five upazilla in Gopalganj District , Department of Public Health Engineering, Under Project for Safe Water Supply Throughout The country ( PSWSC). FY-2024-2025 |
Office Of the Executive Engineer, Gopalganj District |
18/08/2024 |
975406 |
Construction of 1 nos Fecal Sludge and 1 nos Solid Waste
Management Plant/ System at Natore Pouroshava |
Office Of the Executive Engineer, Natore District |
11/08/2024 |
1007765 |
Upgradation, Repair and Renovation of Existing Bathing Facilities with Deep Tubewell Installation and Solar Powered running water facilities at Ukhiya and Teknaf Upazila in Cox's Bazar District |
Office Of the Project Director, Emergency Assistance Project (EAP), DPHE, |
15/07/2024 |
1003245 |
Supply, Installation, Testing and Commissioning of SCADA System for PTW,WTP and Disttribution Network in Taherpur Pourashava, Senbag Pourashava and DPHE Central Control Center |
Office Of the Project Directior, BMWSS (30 Pourashavas), DPHE Dhaka |
11/07/2024 |
1003304 |
Installation of 50mm dia Observation well |
Office Of the Executive Engineer, Rajbari |
26/06/2024 |
997641, 997641 |
Construction,rehabilitation and repair of Existing Solar PV Nano-Gird Mini-Gird and Stand alone Street Light inside the mega-camp Repair 4,000 streetlights and supply spare parts for 2 years
Construction,rehabilitation and repair of Existing Solar PV Nano-Gird Mini-Gird and Stand alone Street Light inside the mega-camp Repair 100 nano-grids energy facilities and supply spare parts for 2 years
|
Office Of the Emergency Assistance Project, DPHE. |
11/06/2024 |
998454 |
Construction of 01 Nos Women Led Community Center (WLCC), 01 Nos Primary Health Care Center (PHC) and Renovation of 06 Nos WLCC. 04 Nos PHCs, 01 Nos upazila health Complex (UHC) at Ukhiya and Teknaf in Cox`s Bazar District. |
Office of the Project Director,Emergency Assistance Project, Dhaka. |
08/05/2024 |
980563 |
installation of 05 nos Shallow tube well(100*38)mm with submersible pump and 05 nos deep tube well(100*38)mm with submersible pump |
Office Of the Executive Engineer, Rajbari |
08/05/2024 |
978487, 977892, 977890 |
Construction of 03 nos (Single Storied) RCC WASH Block having 2 storied foundation |
Office Of the Executive Engineer, Rajbari |
25/02/024 |
941692 |
Supply of IT Server with Necessary Equipment and Accessories and Related Services for Municpal Support Circle, DPHE and Others Under BMWSSP, DPHE. |
Office of the Project Director, BMWSSP (30 Pourashavaw) |
08/02/2024 |
870029, 929702 |
Installation of 05 nos. Point source tube-wells
(100mm x 50mm dia tube-well with 1.5 hp
submersible Pump), 100 nos. Household water
connection and 18 nos. Street Hydrants under the
Project
Installation of 05 nos. Point source tube-wells
(100mm x 50mm dia tube-well with 1.5 hp
submersible Pump), 100 nos. Household water
connection and 18 nos. Street Hydrants under the
Project
|
Office Of the Executive Engineer, Patuakhali |
06/02/2024 |
Jam-WI, ID-892269, Jam-SI ID-892257 |
Installation of 06 (Six) Nos. point Source tube-wells (100 mm*50 mm data tube well with 1.5 hp Submerible pump), Construction of 150 (One Hundred and Fifty) Nos. House hold water Connection and Construction of 24 (Twenty Four) Nos. Street hydent under the Project.
Construction of 5 (Five) Nos Community Latrine 24 (Twenty Four) Nos Communal Bin and 4 (Four) Nos. Transfer Station Under the Project.
|
Office Of the Executive Engineer, Jamalpur |
04/01/2024 |
869114 |
Construction of 06 nos. Community Toilet, 30 nos. communal
bin and 04 nos. transfer station under the Project under
Inclusive and Integrated Sanitation & Hygiene Project in
10 priority Towns in Bangladesh FY 2023-24
|
Office of the Executive Engineer, Pabna |
30/01/2024 |
941617 |
Supply of Water Meter for 30 Pourashava under BMWSSP,DPHE |
Office of the Project Director 30 Pourashavas |
23/01/2024 |
938841 & 939142 |
Supply Equipments and Water Leve Indicator for Pourashavas and 939142 Supply, Installation, Testing and Commissioning of SCADA System for PTW, WTP and Distribution Network in Taherpur Pourashava Senbag Pourashavas and DPHE Central Control Center |
Office of the Project Director 30 Pourashavas |
15/01/2024 |
936060 |
Supply and Installtion of Computer with Printer ,Scaneer PMU,DPHE Field Offices , Pourashavs and others. |
Office of the Project Director
Bangladesh Municipal Water Supply and Sanitation Project (30 Pourashavas)
|
15/01/2024 |
937326 |
Supply of Office Stationary for PMU of Famwork Method. |
Office of the Project Director
Bangladesh Municipal Water Supply and Sanitation Project (30 Pourashavas)
|
09/01/2024 |
934411, 934412 , 934413 |
Installation of (100 x 38) mm dia. deep tube well with submersible pump at different primary schools in different Upazila of Kishoreganj District under Primary Education Development Program-4 (PEDP-4) during FY 2023-24. |
Executive Engineer, DPHE,Kishoreganj District
|
09/01/2024 |
870471 |
Installation of 8nos. of Point source Tube well, 150nos. of Household water collection and 30nos. of street hydrant Under Inclusive and Integrated Sanitation & Hygiene Project in 10 priority Towns in Bangladesh FY 2023-2024 |
Office of the Executive
Engineer, Pabna |
27/12/2023 |
927600, 929453, 928698 & 929459 |
Construction of 2 Storied RCC WASH Block having 2 Storied Foundation for MT & Boys and FT & Girls including all associated Construction, Sanitary, Plumbing & Electrical works at different Upazila of Kishoreganj District under Fourth Primary Education Development Program (PEDP-4) during 2023-24 Financial Year. |
Office of the EE Kishoreganj |
27/12/2023 |
927719,927723,927725,927727, 927729 |
Consturuction of 2 storied RCC WASH Block having 2 Storied Foundation for MT and Boys and FT and Girls including all associated Construction, Sanitary, plumbing and electorical works at different Primary Schools of Different Upazilas under Netrokona District During 2023-24 Financial Year. |
Office of the EE Netrokona. |
21/12/2023 |
927546 |
Construction of single storied Pre-fabricated WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works electrical works at Tungiparaupazilla in Gopalganj District under (NBIDGPS-1) DPHE. |
Office of the Executive Engineer, Gopalganj
|
21/12/2023 |
878299 |
Installation of 13 Nos Point Source Tubewell,300 Nos Household Water Connection and 54 Nos Street Hydrent in Cumilla Townunder Incusive and Integrated Sanitation & Hygiene Project in 10 priority Towns in Bangladesh (Integrated waste Management(IWM) Project) (GOB-IsDB) of DPHE FY 2023-2024. |
Office of the ExecutiveEngineer, DPHE,Comilla |
2012/2023 |
925835 |
Construction of 6 Nos Community Toilet, 30 Nos Communal Bin & 4 Nos Transfer Station in Sirajganj Pourashava of Sirajganj District Under Inclusive and Integrated Sanitation &
Hygiene Project in 10 priority Towns in Bangladesh. |
Office of the Executive
Engineer,Sirajganj |
20/12/2023 |
867192 |
Installation of 8 Nos Point source tube-wells ( 100mm x 50mm dia tube-well with 1.5 hp submersible Pump), Construction of 150 Nos House hold water Connection & 30 Nos Street hydrent in Sirajganj Pourashava of Sirajganj District Under Inclusive and Integrated Sanitation & Hygiene Project in 10 priority Towns in Bangladesh. |
Office of the Executive
Engineer,Sirajganj |
20/12/2023 |
927263,927223 & 926963 |
Construction of Single Storied Combined WASH Block
for MT & Boys and FT & Girls including all associated construction, Sanitary,lumbing & Electrical works at differentlJpazila in Kishoreganj District Under Primary Education Develqpqlent Program - 4 (PEDP 4) during Fy 2023-24. |
Office Of the EE Kishoreganj |
06/12/2023 |
907087 |
Installation of 425 Deep Tubewells with submersible pump and raised platform in kishoreganj. |
Office Of the EE Kishoreganj |
26/09/2023 |
|
Specific Procurement Notice |
Office Of the Project Director, Inclusive and Integrated Sanitation and Hygiene Project in 10 Priority Towns In Bangladesh |
24/09/2023 |
874936 |
Renovation of PMU Office under BMWSSP (30
Pourashavas), DPHE. (Package no.: WD-66) |
Office Of the BMWSSP Project, DPHE |
18/09/2023 |
875936 |
Supply of Water Meter for 30 Pourashavas Under BMWSSP, DPHE |
Office Of the BMWSSP Project, DPHE |
25/07/2023 |
855840, 855843, 855844, 855845, 855846, 855847, 855848, 855849, 855850, 855851 |
Construction of 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, Sanitary, Plumbing & electrical works at different Upazila of Jamalpur District under PEDP 4 (FY 2022-2023) (01 No. 2 Storied Foundation + 01 No Attached Isolated+ 01 No Isolated Combined+ 01 No. 10 ft Design) |
Office Of the EE Jamalpur |
25/07/2023 |
856659,856655, 856653, 856651, 856533, 856522, 856521, 856520, 856516, 856515, 856511 |
Installation of Deep Tubewell |
Office of the EE Barguna |
24/07/2023 |
855884 |
Installation Of (2540 RWHS and 252 RWCA) Coastal Rain Water Harvesting (CRWH) |
Office Of the EE Barguna |
21/06/2023 |
841670, 841682, 841683, 841684, 841686, 841687, 841688, 841689, 841690. |
|
Office of the EE Netrokona District |
07/06/2023 |
844773, 844779 |
Construction Of RCC WASH BLOCK |
Office Of the EE Barguna |
21/05/2023 |
835468, 835469, 835571, 835575, 835592, 835593, 835596, 835 597, 835618, 835 6L9,835 620, 835 62L, 835189, 835207, 835429, 835431, 835457, 835458, 835460,83 5467, 835894. |
Instalation of 100mm x38mm dia deep tubewell with Submersible pump at different Unions of Different Upazilla of Netrokona district of Department of Public Health Engineering during 2023-2024 Financial Year under Project for Safe Water Supply Throughout the Country |
Office of the EE Netrokona Division, Netrokona |
16/05/2023 |
830267,830264,83041,830232 |
Repair and Renovation work in Jamalpur |
Office Of the EE Jamalpur Division, DPHE |
07/05/2023 |
822155 |
Remaining works of Different dia 1375 Nos. House connection of Melandah Pouroshava at Jamalpur District Under Water supply & Environmental Sanitation System Improvement Project for Three Pourashavas of Jamalpur District" (FY:2022-23) |
Office Of the EE Jamalpur Division, DPHE |
12/04/2023 |
722965, 722973 |
Installation of 19(Nineteen) Nos 100*50 mm dia. Shallow tube well with submersible pump at different primary schools of Jamalpur District under NNGPS Project FY-2022-23Installation of 49(Forty Nine) Nos. 100*50 mm dia. Shallow tube well with submersible pump at different primary schools of Jamalpur District under GPS Project FY-2022-23, |
Office Of the EE Jamalpur Division, DPHE |
09/04/2023 |
807087, 808973, 808971 |
1) Need Based Installation Development of Newly Nationalized govt Primary School's (IST Phase) (NIBIDANGPS) (2) Fourth Primary Education Development Program PEDP-4
|
Office of the EE Barguna District |
09/04/2023 |
814670 |
Installation Of (2500 RWHS and 250 RWCA) Costal Rain Water Harvesting (RWH) |
Office Of the EE Barguna District |
09/04/2023 |
815142,815140, 815138, 815137, 815135, 81467 |
i) Installation of Deep Tube Well. ii) Installation of Rain Water Harvesting System
|
Office Of the EE Barguna District |
09/04/2023 |
812374 |
Construction of Primary and Secondary Drain at Birganj Pourashavas Birganj in Dinajpur District under Urban Water Supply and Sanitation in 23 Paurashavas Project in Bangladesh (GOB-IBD) during the FY: 2022-23. |
Office of the EE Dinajpur District |
06/04/2023 |
806604,806605,806606,806607 |
Construction of Single Storied RCC WASH Block having 2 storied foundation for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Different Upazilla in Gopalganj District |
Office Of the EE Gopalganj |
28/03/2023 |
804204 |
Installation of 34 Nos 100 mm x 38 mm Deep Tubewell with Submersible Pump and 46 Nos Deep Tara Tubewell(Extractable) With No.6 Hand Pump with high raised platform at Sadar, Kolmakanda, Atpara and Khaliajuri Upazilas of Netrokona District of Department of Public Health Engineering during 2022-23 Financial Year under revenue budget (4th Phase) for the Purpose Safe Water Supply for Landless People Who have gotten a house of Mujib Sotoborsho. |
Office Of the EE Netrokona, |
27/03/2023 |
805695,805696,805699 |
Installation of 12000 Nos Rain Water Harvesting System (RWHS) and Construction of 1200 Nos Rain Water Catchment Area (RWCA) at Five upazilla in Gopalganj District , Department of Public Health Engineering,Under for Safe Water Supply Project in Coastal Area Through Rain Water Harvesting System FY-2022-2023 |
Office of the EE Gopalganj District |
23/03/2023 |
802725 |
Construction of Rural Piped Water Supply Scheme at Netrokona Sadar with 02 Nos Test Tubewell, 02 nos Production well 01 nos pump house 01 Nos Rcc over head water Tank Mechanical works,Electronic works pipe line water distribution Netrokona etc under Project for Safe water Supply Through out hte country during FY 2021-22 |
Office Of the EE Netrokona District |